153994 Apartment: 1 k 247,35 sq. m., 5th floor in the complex Little France, 1st turn, building 1, delivery: 1sq. , floors: 7, address 20 liniya V. O., 5/1, Developer: AAG.
The premium residential building is located in the heart of St. Petersburg at the beginning of the 20th line of Vasilyevsky Island.
The feeling of home warms a person, brings them closer to their loved ones and helps them feel like a harmonious person. An atmosphere of privacy and social homogeneity emphasizes status. Embodying the symbiosis of architectural and engineering achievements, the Residential Complex expands the concept of comfort and safety of living in the center of a big city.
The residential complex will feature a unique housing format for St. Petersburg: on the first floors of the residential complex there will be two-level apartments with individual entrances similar to the historical residential development of major American cities. Each apartment will have a small front garden, its own local parking with a storage room and a separate entrance to the living room with a wood-burning fireplace. The project also provides for more "traditional" apartments: with French balconies, attics and terraces.
MOSFET finish:
- floor – porcelain stoneware;
- walls-plaster/putty, with the preparation of walls for painting, painting;
- ceiling: hall of the 1st floor-plaster/putty on the w / w floor with decorative elements made of gypsum or fiberglass concrete panels and the location of lighting devices according to the project sketches (all electrical and low-current wiring, hidden either behind decorative panels or in w / w structures), painting;
- corridor and elevator hall of residential floors-plaster/putty on the railway floor with decorative elements made of gypsum panels and the location of lighting devices according to the project sketches (all electrical and low-current wiring, hidden behind decorative panels in cable channels);
- doors: in the elevator lobby-aluminum, insulated, with glazing.
Finishing of apartments: walls, ceilings, window slopes without finishing, screed on the floor.
Entrance doors to apartments: metal insulated, equipped with locks with the possibility of recoding and a peephole (appearance - according to an individual design project), fire resistance limit-in accordance with the STU. Panoramic glazing: stained glass windows-thermally insulated aluminum profile.
All elevators in the residential building are provided with a load capacity of 1000 kg by KONE company without a machine room with the possibility of descending to an underground parking lot.
Landscaping and landscaping of the yard. Decorative lighting of the courtyard, fountain, closed courtyard "without cars", planting of shrubs and tall trees is provided. Children's playgrounds. Bike parks are located in the underground parking lot
Reception area in the lobby of the main entrance. Video surveillance: courtyard area, MOPs on the 1st floor, elevators.
Architectural style in the tradition of classic St. Petersburg apartment buildings of the early twentieth century, but with a tribute to modernity:
- strict slender 4 facades are made in restrained colors with an emphasis on glazing;
- two symmetrical buildings face the street, and the central part forms a spacious green courtyard – cour d'honneur;
- the main main entrance to the building is organized from the courtyard-along the axis with the entrance.
The main facade is modeled with the context in mind: thanks to its finer plastic, clear horizontal division, and restrained but rather abundant detailing, its scale is close to the neighboring buildings consisting of buildings of the turn of the XIX and XX centuries. The central part of the building facing the courtyard is designed as a single element with a developed sculptural wedding. If the organization of structural and facade solutions of the building inherits the techniques of Art Nouveau and Art Deco, then the internal content is subordinated to modern technologies.
For residents on the 1st floor there is the possibility of organizing a fireplace; direct access to the Parking lot and extra-apartment storage room on the 1st floor from the apartment (for most apartments).
Engineering, technologies (heating wiring, floor drain, etc.):
- HVAC, DHW - dead-end, with placement in common corridors of floor collectors with apartment metering units; pipe wiring from the collector to the apartment in the ceiling overlap, installation of a shut-off valve at the entrance to the apartment. The pipe material is cross-linked polyethylene.
- sewerage-risers are laid hidden in factory-made engineering blocks (type A Block) with a tap device with a plug in each apartment for the possibility of connecting sanitary appliances. It is planned to install ladders in the bathrooms, the connection to the riser is hidden in the ceiling. The pipe material is PVC.
- heating - two-pipe collector, with supply from ITP, then perimeter wiring in the overlap of two pipes (direct and reverse) in each apartment; pipe material-cross-linked polyethylene; in apartments with stained-glass windows-convectors are installed in the volume of the window opening.
Heating of the parking lot - by means of ventilation. Heating of storerooms on the 1st floor - electric radiators from el.shield of the apartment that the storeroom belongs to.
IP intercom at the entrance to the entrances of a residential building; at the entrance/exit from the adjacent territory (with video communication support). Television (KTV); Internet, television, radio, telephony (all using ROM technology). Installation of a junction box in the apartment and laying of pipes are provided for the possibility of laying a low-current cable from the MOS shield to the apartment.
In residential areas-forced exhaust with natural flow through valves in the outer walls. Transit air ducts are located in the structure of precast reinforced concrete blocks of the "A Block" type. In the underground parking lot there is a supply and exhaust system with a mechanical drive.
Ceiling height in apartments: 1st floor - 4.28 m (sections A, B, C, 0) 2-5 floors-3.04 m (sections A, B, C, O); 6th floor-3.34 m (sections A, B, C, 0) 7th floor-3.72 m. (sections B and C).